Boston University

From 2007.igem.org

(Difference between revisions)
(About Us)
(About Us)
Line 1: Line 1:
== About Us ==
== About Us ==
Welcome to the wiki for Boston University's iGEM 2007 team!
Welcome to the wiki for Boston University's iGEM 2007 team!
 +
Our team consists of the following members:
Our team consists of the following members:
Line 13: Line 14:
We are grateful to our advisors for taking us on and agreeing to help us:
We are grateful to our advisors for taking us on and agreeing to help us:
 +
 +
 +
== Our Project Plan ==
Our project is aimed at increasing current production from Shewanella Oneidensis by directed evolution of global transcription factors
Our project is aimed at increasing current production from Shewanella Oneidensis by directed evolution of global transcription factors
 +
Our plan so far:
Our plan so far:

Revision as of 18:18, 29 May 2007

About Us

Welcome to the wiki for Boston University's iGEM 2007 team!

Our team consists of the following members:

Undergraduates: David Shi, Rahul Ahuja, Christian Ling, Danny Bellin

Faculty Advisor: link title Dr. Timothy Gardner

Graduate Student Advisors: Frank Juhn, Stephen Schneider

We work at the the Gardner Laboratory.


We are grateful to our advisors for taking us on and agreeing to help us:


Our Project Plan

Our project is aimed at increasing current production from Shewanella Oneidensis by directed evolution of global transcription factors

Our plan so far:

  1. Mutate global transcription factors
    1. Design primers for amplification
    2. Perform error-prone PCR
  1. Transform mutated genes into E. coli
    1. Choose plasmids
    2. Restriction enzyme digestion
    3. Ligation
    4. Transformation into E. coli
  1. Conjugate E. coli with Shewanella
  1. Screen/select for increased current production due to mutations

Week's Goals

Wednesday 5/30

  1. Get all protocols
  2. Identify materials/prepare order
  3. Design Primers
  4. Learn about budget/POs

Thursday 5/31

  1. Do primer order
  2. Start conjugation practice
  3. Confirm restriction enzymes, ligases
  4. Order confirmed/needed materials
  5. Team Revew Meeting

Friday 6/1

  1. Evaluate/continue conjugation, practice electroporation for E. coli
  2. Meeting with Tim: Budgets/protocols, Pfizer/fundraising, iGEM registration, beads