September: Second Week

From 2007.igem.org

(Difference between revisions)

Revision as of 19:43, 23 September 2007

  • The assembling of the parts that are going to be introduced in the construction of the chassis and the biosensor device were started. Transformation of competent cells and controls made with these cells at different times were started.