Lethbridge/Timeline

From 2007.igem.org

< Lethbridge(Difference between revisions)
m
 
(11 intermediate revisions not shown)
Line 1: Line 1:
<center>
<center>
 +
[[Image:Leth_logo.png]]
== Project Timeline ==
== Project Timeline ==
-
[[Image:logo.jpg]]
 
</center>
</center>
 +
 +
__TOC__
 +
===Phase 1: Project Planning===
===Phase 1: Project Planning===
-
Initial project planning - what project to pursue?
+
* Initial project planning - what project to pursue?
-
<br>
+
* Detailed project planning  
-
Detailed project planning - Project selected -  riboswitch controlling both motility and colored
+
** Project selected -  riboswitch controlling both motility and colored output
-
output
+
<br />
-
<br>
+
===Phase 2: Initial assembly===
===Phase 2: Initial assembly===
-
Reporter system
+
* Reporter system
-
  - GFP repressor (TetR) and LacI inhibited promoter transformed successfully
+
* Chemotaxis system
-
  -RFP with promoter, RBS, and terminators transformed but does not emit RF
+
<br />
-
    under UV light and plasmid too small, will have to build from five subparts.
+
-
  -GFP, LacI, and four subparts of RFP left to go
+
-
Chemotaxis system
 
===Phase 3: Component Testing===
===Phase 3: Component Testing===
-
Test reporter system and chemotaxis system
+
* Test reporter system and chemotaxis system
 +
<br />
===Phase 4: Final Assembly and System Testing===
===Phase 4: Final Assembly and System Testing===
 +
<!--#614-->
-
<center>
+
<div style="display:block; text-align:center; border:2px solid #6C5; width:500px; margin:auto; margin-top:3em; padding:5px;">
-
Quicklinks
+
  <p> [[Lethbridge | Main Page]] &#124; [[Lethbridge/Summary | Project Overview]] &#124; [[Lethbridge/Timeline | Timeline]] &#124; [[Lethbridge/Notebook | Lab Notebook]] &#124; [[Lethbridge/Team | Team Members]]</p>
-
 
+
</div>
-
<p>[[Lethbridge | Main Page]] &#124;
+
-
 
+
-
[[Lethbridge/Summary | Project Summary]] &#124;
+
-
 
+
-
[[Lethbridge/Notebook | Lab Notebook]] </p>
+
-
</center>
+

Latest revision as of 16:42, 7 August 2007

Leth logo.png

Project Timeline

Contents


Phase 1: Project Planning

  • Initial project planning - what project to pursue?
  • Detailed project planning
    • Project selected - riboswitch controlling both motility and colored output


Phase 2: Initial assembly

  • Reporter system
  • Chemotaxis system


Phase 3: Component Testing

  • Test reporter system and chemotaxis system


Phase 4: Final Assembly and System Testing

Main Page | Project Overview | Timeline | Lab Notebook | Team Members