September: Second Week
From 2007.igem.org
(Difference between revisions)
SilvanaSaieh (Talk | contribs) |
SilvanaSaieh (Talk | contribs) |
||
Line 1: | Line 1: | ||
- | + | <p style="font-family: Rockwell">[[Image:Check mark3.jpg|25px]] The assembling of the parts that are going to be introduced in the construction of the chassis and the biosensor device were started. Transformation of competent cells and controls made with these cells at different times were started.</p> |
Revision as of 10:42, 26 October 2007
The assembling of the parts that are going to be introduced in the construction of the chassis and the biosensor device were started. Transformation of competent cells and controls made with these cells at different times were started.