September: Second Week

From 2007.igem.org

(Difference between revisions)
 
(2 intermediate revisions not shown)
Line 1: Line 1:
-
*The assembling of the parts that are going to be introduced in the construction of the chassis and the biosensor device were started. Transformation of competent cells and controls made with these cells at different times were started.
+
{|
 +
| style="background:lemonchiffon; color:black" |
 +
 
 +
<p style="font-family: Rockwell">[[Image:Check mark3.jpg|25px]] The assembling of the parts that are going to be introduced in the construction of the chassis and the biosensor device were started. Transformation of competent cells and controls made with these cells at different times were started.</p>
 +
 
 +
|}

Latest revision as of 11:47, 26 October 2007

Check mark3.jpg The assembling of the parts that are going to be introduced in the construction of the chassis and the biosensor device were started. Transformation of competent cells and controls made with these cells at different times were started.