Melbourne/meeting 7 September 2007
From 2007.igem.org
< Melbourne(Difference between revisions)
Line 1: | Line 1: | ||
== 5:30 Action points from last meeting:== | == 5:30 Action points from last meeting:== | ||
- | |||
- | |||
*Jan: Plan for blue light on wiki by 17th August- Done but needs more work: couldn’t get anyone else to implement it based on this! | *Jan: Plan for blue light on wiki by 17th August- Done but needs more work: couldn’t get anyone else to implement it based on this! | ||
- | + | *Craig: Alkaline lysis technique for miniprep to be documented-Done | |
- | + | *Cheng: Daisy to produce enz- competent cells -Done | |
- | + | *Phil: contact MIT re digest of M30109- No responce from MIT (from August) | |
- | + | ||
- | + | ||
- | + | ||
- | *Craig: Alkaline lysis technique for miniprep to be documented | + | |
- | + | ||
- | + | ||
- | + | ||
- | *Cheng: Daisy to produce competent cells | + | |
- | + | ||
- | * | + | |
- | + | ||
- | + | ||
== 5:35 Status Reports: (5 minutes each including any discussion)== | == 5:35 Status Reports: (5 minutes each including any discussion)== | ||
- | |||
- | |||
- | |||
- | |||
*Pat & Alisa: Red light receptor progress/design/plan- needs? | *Pat & Alisa: Red light receptor progress/design/plan- needs? | ||
- | ** | + | **M30109 no resolution to strange digest products |
+ | ** Must construct from scratch | ||
- | *Jan: Blue light receptor design/plan progress - needs? | + | *Jan: Blue light receptor design/plan progress - needs? |
+ | **Primers designed but not ordered - will order by Monday | ||
+ | **ComA and Com P in | ||
*Phil: Gas vesicles progress/design/plan - needs? | *Phil: Gas vesicles progress/design/plan - needs? | ||
- | **Progress | + | **No Progress , round 4 of mutagenesis plated awaits culture and diggest(4 plates). |
- | + | **Buoyancy experiment needs repeating | |
- | **Buoyancy experiment | + | |
**Other parts required from kit->glycerol stocks: B034 (P1-3O) , B0015 (P1-1I or P3-3O), J61034 (P4-8F or 8H) | **Other parts required from kit->glycerol stocks: B034 (P1-3O) , B0015 (P1-1I or P3-3O), J61034 (P4-8F or 8H) | ||
Line 40: | Line 24: | ||
==5.55 New Agenda Items:== | ==5.55 New Agenda Items:== | ||
- | *Phil: Administrative Timetable: ( | + | *Phil: Administrative Timetable: (6 Weeks to go) |
+ | |||
- | |||
*Chris: Next years Comp Plan/preparations - same state as last week | *Chris: Next years Comp Plan/preparations - same state as last week | ||
- | |||
- | * Next meeting: <b/> | + | * Next meeting: <b/> 14th September (Friday) 5.30PM. |
==6:15 End == | ==6:15 End == | ||
Line 87: | Line 70: | ||
- | + | *re prism :Edmund optics:VIS60 Schott veril linear variable interference filter SGD$1600 25mm wide 60mm long linear 400nm-700nm (contact sheet) | |
+ | N47-279 eqilateral prism 35mm long 35mm face SGD$162 | ||
Latest revision as of 06:08, 14 September 2007
Contents |
5:30 Action points from last meeting:
- Jan: Plan for blue light on wiki by 17th August- Done but needs more work: couldn’t get anyone else to implement it based on this!
- Craig: Alkaline lysis technique for miniprep to be documented-Done
- Cheng: Daisy to produce enz- competent cells -Done
- Phil: contact MIT re digest of M30109- No responce from MIT (from August)
5:35 Status Reports: (5 minutes each including any discussion)
- Pat & Alisa: Red light receptor progress/design/plan- needs?
- M30109 no resolution to strange digest products
- Must construct from scratch
- Jan: Blue light receptor design/plan progress - needs?
- Primers designed but not ordered - will order by Monday
- ComA and Com P in
- Phil: Gas vesicles progress/design/plan - needs?
- No Progress , round 4 of mutagenesis plated awaits culture and diggest(4 plates).
- Buoyancy experiment needs repeating
- Other parts required from kit->glycerol stocks: B034 (P1-3O) , B0015 (P1-1I or P3-3O), J61034 (P4-8F or 8H)
5.55 New Agenda Items:
- Phil: Administrative Timetable: (6 Weeks to go)
- Chris: Next years Comp Plan/preparations - same state as last week
- Next meeting: <b/> 14th September (Friday) 5.30PM.
6:15 End
Igem Administrative Timetable:
1 September | Final team rosters due. |
1 September | Jamboree attendance fees due $100USD per team member. |
26 October | Project and part documentation due DNA received USA. |
26 October | BioBrick Part DNA received by the Registry. |
3-4 November | iGEM Competition Jamboree, MIT, USA. |
.
- re prism :Edmund optics:VIS60 Schott veril linear variable interference filter SGD$1600 25mm wide 60mm long linear 400nm-700nm (contact sheet)
N47-279 eqilateral prism 35mm long 35mm face SGD$162
Documentation wiki status:
- Priority should be on plans and experimental report analysis and conclusions-----Alisa .
- If only Pat & Alisa doing lab work not much documentation needed.
- Equipement:
- MissingLas3000 method (in lab notebook)
- Missing DNA measurement protocol (eppendorf)
- Reagents pages incomplete:
- Some location pictures not finished or uploaded.
- Some newer reagents not entered.
- Secondary reagents pages not made:
- LB, Plates, TAE , NZY+ Broth
- Protocol part:
- No connections from Protocols to reagents.
- Ligation protocol missing
- Lab notebook:
- Format uses too many lines to see connections between days.
- Latter part missing links
- Can table of contents be restricted to date level?
- Experimental reports:
- Lacks discussion/conclusion
- Ligation experiment missing
- Lattest few gells not marked up and entered.
- Project overview link broken
- Background:
- GFP missing ,
- Red photo sensor to GFP test harness missing.
- Plan: Only Gas vesicles plan entered.
Individual | Desired time committment |
---|---|
Pat | About 4h/wk Monday afternoon or Tuesday morning |
Alisa | About 4h/wk - Thursday afternoon |
Jan | About 10h/pw - flexible weekday mornings |
Phil | About 18h/pw - Thursday morning, Friday, Saturday or Sunday, |