Alberta/Calender/September
From 2007.igem.org
(→September 23) |
(→September 18) |
||
Line 412: | Line 412: | ||
== September 18 == | == September 18 == | ||
+ | NK - 8 AM | ||
VH - (@1pm) | VH - (@1pm) |
Revision as of 21:46, 16 September 2007
September
|
To August 2007
To October 2007
Back to UofA iGEM Home
September 1
Lab Notes
1. 24 Minipreps for Diezel Blaze in B0034 using Fermentas Kit; stored in -20 freezer
2. Lots of colonies from the transformation last night; no colonies on negation control (good) and lots of colonies on positive control (good) and no satellite colonies (also good); no colonies were picked for overnights
3. Run the Buddy+Benny in B00 and Betty+Enny in B00 Pst/Xba gel from last night at 50V for another 30 minutes for better resolution; all the digest worked so I cut out the appropriate bands and stored the gel in -20 freezer for purification later
-CZ
September 2
September 3
September 4
Schedule:
JP,ML,JG 7:00pm
For the record:
Buddy = BuOH DH 1235 bp
Betty = Bb-bhBu-coa dh 923 bp
Benny = Butyryl coa dh 1184 bp
enny = Enoyl coa Hydratase 860 bp
Diezel Blaze = buAld-Dh 2639 bp
Notes:
Moving was done this mid-day.
New location M349
JG has key & access
- MC, ED, JG
Evening crew - please do a once over of G308 to double check we have not left anything and to clean up anything extra/ things we should get out of the way. thnx - MC
Night Crew
-JP, JG
Set up new lab
Things we need - Water Bath, Scale, disposable 13ml overnight tubes, Tip waste
lab work
Gel purification ran on Betty,enny and boo as well as buddy and benny and is in the -20 in the new lab
To Do list for tomorrow
- Restriction on DB needs to be done - If we want to put it in front of BE or BB then Spe/Pst - If we want to put it behind BE or BB then cut with Xba/Pst - maybe do both (use 4microL DNA for digest)
-complete restriction on BE and BB for SPE and PST (then we can complete ligations BE-BB and BB-BE or we can ligate D.B into BE or BB to make BE-DB or DB-BE or BB-DB or DB-BB- Then we can ligate BE-BB-DB or DB-BE-BB or BE-BB-DB or BB-DB-BE or BB-BE-DB and we are kinda finished!
- If I0500 comes in from calgary it needs to be transformed.
- Transform R0080 which is a back up promoter just in case?
-Note we also have to do sequenceing on BB and BE and DB
Shout out to calgary for saving our necks Shout out to the move in crew to the top
September 5
Schedule:
NG,ED,ML 7:00pm
AM Crew Notes:
finished up cleaning up post-move in
got a 'water bath' - JG calibrated it
prepared BB in Boo & BE in Boo for sequencing - this will be ready for pick up tomorrow
Restricted:
- DB in BOO with PST/XBA
- DB in BOO with PST/SPE
- BB in BOO with PST/SPE
- BE in BOO with PST/SPE
NB: there is a section in the masterbook "figuring stuff out" just a few questions I have from being away so long - don't worry about it we should do a wet lab recap to bring everyone on the same page at our meeting Thrusday - MC
<3 JG & MC
Transformed I0500 from Calgary. Transformed R0080. Ran digestions on gel. Ligated digested DB with BB and BE. (all in Boo)
-ED, ML
September 6
Schedule:
NK ED AL 5:00pm (Unless your crazy enough to show up at 5AM)
To Do:
Ligations
Goodies will be served during the meeting (7:00pm @ CAB 373), so be sure to show up!
September 7
Schedule:
AM Crew: MC, JG meeting at 800hrs
Lab Notes:
No growth observed for R0080 overnights; just scrapping it because we have I0500
No growth on transformations of BB+DB and BE+DB ligations therefore . . . religated - see masterbook for more details
O/N with AMP for I0500
Transform religations in to XL10 Gold
-MC, JG, ML
NB: JG has key access
To Do:
Mini preps on I0500 overnights
September 8
Schedule:
Super Awesome Marathon of Productiveness
8-11: JG,NG
11-2: AL,ML
2-5: VH,NK
5-8: JP
September 9
Schedule:
And Yet another super productive Sunday
8-11: NG and CZ
NG - Nobody Called me about the key last night (and I completely forgot to swing by: was with parents). So I will wait by the lab either , until the next group shows up or someone with a key. Also bioSci is locked but there is an open door by the physcology wing. I have my cell on 902-8032.
NG - Update: 9:30am 'broke' into lab :D. Then found key...
11-2: VH, CZ
Nick ran the gel of I0500 restricited by Eco/Spe, but nothing showed up as expected (1.5kb).
Digested I0500 and J61003 with Eco/Pst as instructed.
2-5: MC, JG
ran gel of restricted I0500 & J61003; unfortunately there is no DNA in the I0500 sample either
gel extracted J61003
Made LB - to be divided into bottles & autoclaved in G308
O/N of DB in BB & DB in BE samples left in 37degree room
5-8: ML, ED autoclaved little bottles of LB. NOTE: does not need to be autoclaved before you pour it into little bottles and then re-autoclave. Just pour into bottles and autoclave once digested all in Boos except for DB with Pst/xba
September 10
Schedule: And Scheduling just got hard core
I have sheduled what we have taken down in the meeting some people appear many times on this schedule working alone just because of the time they were availible. If you are comfortable working alone and taking on lots of shifts im sure the team would be greatful but I'm also sure we would also understand if you didn't want to work alone in the lab. I have only scheduled this way because we need man hours so i tried to fill up all the spots as best i could. -JG
MC,JG for the AM
put away bottled LB
Ran gel of last night's restricted samples "in boo"; did not really turn out
ran gel of uncut & single restricted I0500; uncut I0500 showed 2 bands and restricted showed nothing
Mini prepped Ligations of DB in BB and DB in BE
to do:
- run gel of double digested I0500
- do single & double restriction on Mini prep of Ligations
- run gel of uncut, single & double restrictions of mini prepped ligations
ML,AL for the MID (AM crew: What time will you guys be at the lab till? I won't be there until 12:30. Might need to arrange something in order to pick up keys. - AL)
NG (2:30-4) for the PM (celine is in calgary if you dont feel comfortable in the lab by yourself I can show up - JG) Jason if you have time to show up that would be sweet, but if you don't I understand. -NG
JP,ED for the Night
September 11
Schedule: No one else really signed up for tuesdays so anyone who has time to drop in should
AM- NK
Mid - AL (12:30 - 2 ish), NG (random)
Night- ED JP
mini relocation 1 bench back, do not use the first 3 benches of the lab or the blackboard from now on!
September 12
Schedule:
NG Hi guys I have a meeting 3:30 that cannot be reseached I moved myself to come in Tuesday instead (when nobody was in).
AM -
Mid- ML, AL
Important: Please evacuate lab before 2:00pm as there is a lab class starting at this time till 5pm! -AL
PM - VH (I will be in at about 1 or 1:30PM, if there is something written down for me to do I can work at it by myself, otherwise if someone wants to come in and get me started on something that would be nice.)
VH: please make note of the above announcement regarding lab class at 2:00pm
Night - CZ, ED
Sorry I have meeting at 6pm which should last no longer than 2 hours, so I will come at 8pm the latest.
to the top
September 13
Schedule:
AM-Nik
Hey guys, i wont be able to make it till 930 AM-NK
PM - VH, JG
Meeting 7:00
September 14
Schedule:
AM - MC (around 900/930hrs)
- Mini prep from O/N of BBDBE & BEDBB
- Glycerol stocks of BBDBE & BEDBB, and restreaked quartered plates
- Gel extraction of BE & BB Xba/Pst
- made gel
Mid - AL
PM - VH, CZ
night - JP
September 15
Schedule:
And yet another crazy weekend...
8-11 - ED,MC
11-2 - JG, ML
2-5 - NG, CZ
5-8 - NK, I have it covered.
Could not do transformation ligations because could not find competent cells. The ligations are in the -20 freezer with the green tape saying "ligations, sept 15". -NK
September 16
Schedule: Continued...
8-11 ED, JG
11-2 VH, CZ
2-5 MC, JP
5-8 - ML, NG
September 17
AM - MC (@ 800hrs)
September 18
NK - 8 AM
VH - (@1pm)
September 19
ED- 6PM
September 20
VH - (@1PM)
September 21
AM - MC (@ 800hrs) ED - 4 PM
September 22
ED 9-12
September 23
ED 9-12
September 24
September 25
September 26
September 27
September 28
September 29
September 30