3:30 Action points from last meeting:
- Alisa: Get plan for blue light on wiki (from 10 Aug). Alisa has done a plan but this is not on Wiki.
3:35 Status Reports: (5 minutes each including any discussion)
- Pat : Red light receptor progress/design/plan- needs?
- M30109: Must construct from scratch plan to be produced by Pat.
- craig seqenced Cph8 from M30109 first part present
- Cph8 from initial plate not functional
- This is then drives RBS-ComP-term
- RBS-ComP -done
- Also required is ConstitutiveProm-RBS-ComA-term
- RBS-ComA-term -done
- M30109: Must construct from scratch plan to be produced by Pat.
- Jan & Alisa: Blue light receptor design/plan progress - needs?
- ComP and SopII conbined at variouse points by using 4 primer stiching:
- Comp P forward
- SopII reverse
- ComP-SoPII overlap sense
- ComP-SopII overlap antisense
- Note that there are 7 different stiching pairs that result in combination at different points.-Done
- The product is then combined with RBS -Done
- Sequencing being performed Friday
- Then transcription terminator
- The constitutive promotor to create protein generator part.
- Also Required is reporter construct PsfPromoter-RBS-LacZ-term
- Only three colonies pSFR8 grew in LB
- ComP and SopII conbined at variouse points by using 4 primer stiching:
- Phil: Gas vesicles progress/design/plan - needs?
- Ligation P48J (SpeI & PstI digested) to PCR(GvpL) underway
- Ligation P48J (SpeI & PstI digested) to PCR(GvpB to GvpU inclusive)(XbaI and PstI digested) underway
- Buoyancy experiment needs repeating
- Other parts required from kit->glycerol stocks: B034 (P1-3O) , B0015 (P1-1I or P3-3O), J61034 (P4-8F or 8H)
- Pat to provide these.
3.55 New Agenda Items:
- Sally Grass (chemical and biochemical engineering):
- interested in signal transduction.
- moving to lab in bio21.
- will help promote next years comp
- Suggested Chris contact Lisa Hayes in chem eng re promotion.
- Phil: Administrative Timetable: (4 Weeks to go)
- Chris: Next years Comp Plan/preparations
- Slide prepared
- Alisa: To make competent cells to replace Joes
- Alisa: Tshirt should be simple based on Melb Uni logo, will propose a design
- Paul: suggested Ian Potter foundation may provide travel funding
- Next meeting: <b/> 27th September (Thurs) 3.30PM.