Alberta/Calender/September

From 2007.igem.org

< Alberta | Calender
Revision as of 03:53, 17 September 2007 by CelineYZ (Talk | contribs)

Contents

September

September 2007
Su M Tu W Th F Sa
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30


To August 2007
To October 2007
Back to UofA iGEM Home

September 1


Lab Notes
1. 24 Minipreps for Diezel Blaze in B0034 using Fermentas Kit; stored in -20 freezer
2. Lots of colonies from the transformation last night; no colonies on negation control (good) and lots of colonies on positive control (good) and no satellite colonies (also good); no colonies were picked for overnights
3. Run the Buddy+Benny in B00 and Betty+Enny in B00 Pst/Xba gel from last night at 50V for another 30 minutes for better resolution; all the digest worked so I cut out the appropriate bands and stored the gel in -20 freezer for purification later

-CZ


to the top

September 2

to the top

September 3

to the top

September 4

Schedule:

JP,ML,JG 7:00pm


For the record:
Buddy = BuOH DH 1235 bp
Betty = Bb-bhBu-coa dh 923 bp
Benny = Butyryl coa dh 1184 bp
enny = Enoyl coa Hydratase 860 bp
Diezel Blaze = buAld-Dh 2639 bp

Notes:
Moving was done this mid-day.
New location M349
JG has key & access
- MC, ED, JG

Evening crew - please do a once over of G308 to double check we have not left anything and to clean up anything extra/ things we should get out of the way. thnx - MC

Night Crew

-JP, JG

Set up new lab

Things we need - Water Bath, Scale, disposable 13ml overnight tubes, Tip waste

lab work

Gel purification ran on Betty,enny and boo as well as buddy and benny and is in the -20 in the new lab

To Do list for tomorrow

- Restriction on DB needs to be done - If we want to put it in front of BE or BB then Spe/Pst - If we want to put it behind BE or BB then cut with Xba/Pst - maybe do both (use 4microL DNA for digest)

-complete restriction on BE and BB for SPE and PST (then we can complete ligations BE-BB and BB-BE or we can ligate D.B into BE or BB to make BE-DB or DB-BE or BB-DB or DB-BB- Then we can ligate BE-BB-DB or DB-BE-BB or BE-BB-DB or BB-DB-BE or BB-BE-DB and we are kinda finished!

- If I0500 comes in from calgary it needs to be transformed.

- Transform R0080 which is a back up promoter just in case?


-Note we also have to do sequenceing on BB and BE and DB

Shout out to calgary for saving our necks Shout out to the move in crew to the top

September 5

Schedule:

NG,ED,ML 7:00pm

AM Crew Notes:

finished up cleaning up post-move in
got a 'water bath' - JG calibrated it
prepared BB in Boo & BE in Boo for sequencing - this will be ready for pick up tomorrow
Restricted:
- DB in BOO with PST/XBA
- DB in BOO with PST/SPE
- BB in BOO with PST/SPE
- BE in BOO with PST/SPE
NB: there is a section in the masterbook "figuring stuff out" just a few questions I have from being away so long - don't worry about it we should do a wet lab recap to bring everyone on the same page at our meeting Thrusday - MC
<3 JG & MC

Transformed I0500 from Calgary. Transformed R0080. Ran digestions on gel. Ligated digested DB with BB and BE. (all in Boo)

-ED, ML


to the top

September 6

Schedule:

NK ED AL 5:00pm (Unless your crazy enough to show up at 5AM)

To Do:
Ligations

Goodies will be served during the meeting (7:00pm @ CAB 373), so be sure to show up!

to the top

September 7

Schedule:

AM Crew: MC, JG meeting at 800hrs

Lab Notes:
No growth observed for R0080 overnights; just scrapping it because we have I0500
No growth on transformations of BB+DB and BE+DB ligations therefore . . . religated - see masterbook for more details
O/N with AMP for I0500
Transform religations in to XL10 Gold
-MC, JG, ML

NB: JG has key access

To Do:
Mini preps on I0500 overnights


to the top

September 8

Schedule:

Super Awesome Marathon of Productiveness

8-11: JG,NG

11-2: AL,ML

2-5: VH,NK

5-8: JP


to the top

September 9

Schedule:

And Yet another super productive Sunday

8-11: NG and CZ

NG - Nobody Called me about the key last night (and I completely forgot to swing by: was with parents). So I will wait by the lab either , until the next group shows up or someone with a key. Also bioSci is locked but there is an open door by the physcology wing. I have my cell on 902-8032.

NG - Update: 9:30am 'broke' into lab :D. Then found key...

11-2: VH, CZ
Nick ran the gel of I0500 restricited by Eco/Spe, but nothing showed up as expected (1.5kb).
Digested I0500 and J61003 with Eco/Pst as instructed.

2-5: MC, JG
ran gel of restricted I0500 & J61003; unfortunately there is no DNA in the I0500 sample either
gel extracted J61003
Made LB - to be divided into bottles & autoclaved in G308
O/N of DB in BB & DB in BE samples left in 37degree room

5-8: ML, ED autoclaved little bottles of LB. NOTE: does not need to be autoclaved before you pour it into little bottles and then re-autoclave. Just pour into bottles and autoclave once digested all in Boos except for DB with Pst/xba

to the top

September 10

Schedule: And Scheduling just got hard core

I have sheduled what we have taken down in the meeting some people appear many times on this schedule working alone just because of the time they were availible. If you are comfortable working alone and taking on lots of shifts im sure the team would be greatful but I'm also sure we would also understand if you didn't want to work alone in the lab. I have only scheduled this way because we need man hours so i tried to fill up all the spots as best i could. -JG

MC,JG for the AM
put away bottled LB
Ran gel of last night's restricted samples "in boo"; did not really turn out
ran gel of uncut & single restricted I0500; uncut I0500 showed 2 bands and restricted showed nothing
Mini prepped Ligations of DB in BB and DB in BE

to do: - run gel of double digested I0500
- do single & double restriction on Mini prep of Ligations
- run gel of uncut, single & double restrictions of mini prepped ligations

ML,AL for the MID (AM crew: What time will you guys be at the lab till? I won't be there until 12:30. Might need to arrange something in order to pick up keys. - AL)

NG (2:30-4) for the PM (celine is in calgary if you dont feel comfortable in the lab by yourself I can show up - JG) Jason if you have time to show up that would be sweet, but if you don't I understand. -NG


JP,ED for the Night


to the top

September 11

Schedule: No one else really signed up for tuesdays so anyone who has time to drop in should

AM- NK

Mid - AL (12:30 - 2 ish), NG (random)

Night- ED JP

mini relocation 1 bench back, do not use the first 3 benches of the lab or the blackboard from now on!

to the top

September 12

Schedule:

NG Hi guys I have a meeting 3:30 that cannot be reseached I moved myself to come in Tuesday instead (when nobody was in).

AM -

Mid- ML, AL

Important: Please evacuate lab before 2:00pm as there is a lab class starting at this time till 5pm! -AL

PM - VH (I will be in at about 1 or 1:30PM, if there is something written down for me to do I can work at it by myself, otherwise if someone wants to come in and get me started on something that would be nice.)

VH: please make note of the above announcement regarding lab class at 2:00pm

Night - CZ, ED
Sorry I have meeting at 6pm which should last no longer than 2 hours, so I will come at 8pm the latest.
to the top

September 13

Schedule:

AM-Nik

Hey guys, i wont be able to make it till 930 AM-NK

PM - VH, JG

Meeting 7:00


to the top

September 14

Schedule:

AM - MC (around 900/930hrs)
- Mini prep from O/N of BBDBE & BEDBB
- Glycerol stocks of BBDBE & BEDBB, and restreaked quartered plates
- Gel extraction of BE & BB Xba/Pst
- made gel

Mid - AL

PM - VH, CZ

night - JP


to the top

September 15

Schedule:

And yet another crazy weekend...

8-11 - ED,MC

11-2 - JG, ML

2-5 - NG, CZ

5-8 - NK, I have it covered.

Could not do transformation ligations because could not find competent cells. The ligations are in the -20 freezer with the green tape saying "ligations, sept 15". -NK

to the top

September 16

Schedule: Continued...

8-11 ED, JG

11-2 VH, CZ

2-5 MC, JP

5-8 - ML, NG


to the top

September 17

AM - JG (800 hrs - 930hrs),MC (@ 800hrs)


to the top

September 18

NK - 8 AM

VH - (@1pm)

to the top

September 19

CZ-2:15PM
ED- 6PM


to the top

September 20

NK - 8 AM

VH - (@1PM)

JG- (@5PM)

to the top

September 21

AM - MC, JG (@ 800hrs)
CZ-2:15PM
ED - 4 PM

to the top

September 22

ED 9-12


to the top

September 23

ED 9-12

to the top

September 24

to the top

September 25

to the top

September 26

to the top

September 27

to the top

September 28

to the top

September 29

to the top

September 30

to the top


UofA iGEM Home
To August 2007