Alberta/Calender/September

From 2007.igem.org

< Alberta | Calender
Revision as of 04:46, 7 September 2007 by JGARD (Talk | contribs)

Contents

September

September 2007
Su M Tu W Th F Sa
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30


To August 2007
Back to UofA iGEM Home

== September 1 ==

Lab Notes
1. 24 Minipreps for Diezel Blaze in B0034 using Fermentas Kit; stored in -20 freezer
2. Lots of colonies from the transformation last night; no colonies on negation control (good) and lots of colonies on positive control (good) and no satellite colonies (also good); no colonies were picked for overnights
3. Run the Buddy+Benny in B00 and Betty+Enny in B00 Pst/Xba gel from last night at 50V for another 30 minutes for better resolution; all the digest worked so I cut out the appropriate bands and stored the gel in -20 freezer for purification later

-CZ


to the top

September 2

to the top

September 3

to the top

September 4

Schedule:

JP,ML,JG 7:00pm


For the record:
Buddy = BuOH DH 1235 bp
Betty = Bb-bhBu-coa dh 923 bp
Benny = Butyryl coa dh 1184 bp
enny = Enoyl coa Hydratase 860 bp
Diezel Blaze = buAld-Dh 2639 bp

Notes:
Moving was done this mid-day.
New location M349
JG has key & access
- MC, ED, JG

Evening crew - please do a once over of G308 to double check we have not left anything and to clean up anything extra/ things we should get out of the way. thnx - MC

Night Crew

-JP, JG

Set up new lab

Things we need - Water Bath, Scale, disposable 13ml overnight tubes, Tip waste

lab work

Gel purification ran on Betty,enny and boo as well as buddy and benny and is in the -20 in the new lab

To Do list for tomorrow

- Restriction on DB needs to be done - If we want to put it in front of BE or BB then Spe/Pst - If we want to put it behind BE or BB then cut with Xba/Pst - maybe do both (use 4microL DNA for digest)

-complete restriction on BE and BB for SPE and PST (then we can complete ligations BE-BB and BB-BE or we can ligate D.B into BE or BB to make BE-DB or DB-BE or BB-DB or DB-BB- Then we can ligate BE-BB-DB or DB-BE-BB or BE-BB-DB or BB-DB-BE or BB-BE-DB and we are kinda finished!

- If I0500 comes in from calgary it needs to be transformed.

- Transform R0080 which is a back up promoter just in case?


-Note we also have to do sequenceing on BB and BE and DB

Shout out to calgary for saving our necks Shout out to the move in crew to the top

September 5

Schedule:

NG,ED,ML 7:00pm

AM Crew Notes:

finished up cleaning up post-move in
got a 'water bath' - JG calibrated it
prepared BB in Boo & BE in Boo for sequencing - this will be ready for pick up tomorrow
Restricted:
- DB in BOO with PST/XBA
- DB in BOO with PST/SPE
- BB in BOO with PST/SPE
- BE in BOO with PST/SPE
NB: there is a section in the masterbook "figuring stuff out" just a few questions I have from being away so long - don't worry about it we should do a wet lab recap to bring everyone on the same page at our meeting Thrusday - MC
<3 JG & MC

Transformed I0500 from Calgary. Transformed R0080. Ran digestions on gel. Ligated digested DB with BB and BE. (all in Boo)

-ED, ML


to the top

September 6

Schedule:

NK ED AL 5:00pm (Unless your crazy enough to show up at 5AM)

To Do:
Ligations

Goodies will be served during the meeting (7:00pm @ CAB 373), so be sure to show up!

to the top

September 7

Schedule:

AM Crew: MC, JG meeting at 800hrs

to the top

September 8

Schedule:

Super Awesome Marathon of Productiveness

8-11: JG,NG

11-2: AL,ML

2-5: VH,NK

5-8: JP


to the top

September 9

Schedule:

And Yet another super productive Sunday

8-11: NG and CZ

11-2: VH, CZ

2-5: MC, JG

5-8: ML, ED

to the top

September 10

Schedule: And Scheduling just got hard core

MC,JG for the AM

ML,AL for the MID

NG for the PM (celine is in calgary if you dont feel comfortable in the lab by yourself I can show up - JG)

JP,ED for the Night


to the top

September 11

Schedule: No one else really signed up for tuesdays so anyone who has time to drop in should

AM- NK

Mid - AL

Night- ED JP

to the top

September 12

Schedule:

AM - MC

Mid- ML, AL

PM - VH, NG

Night - CZ, ED

to the top

September 13

to the top

September 14

to the top

September 15

to the top

September 16

to the top

September 17

to the top

September 18

to the top

September 19

to the top

September 20

to the top

September 21

to the top

September 22

to the top

September 23

to the top

September 24

to the top

September 25

to the top

September 26

to the top

September 27

to the top

September 28

to the top

September 29

to the top

September 30

to the top


UofA iGEM Home
To August 2007