September: Second Week

From 2007.igem.org

Revision as of 19:43, 23 September 2007 by SilvanaSaieh (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
  • The assembling of the parts that are going to be introduced in the construction of the chassis and the biosensor device were started. Transformation of competent cells and controls made with these cells at different times were started.