Melbourne/meeting 20 September 2007

From 2007.igem.org

< Melbourne
Revision as of 03:59, 27 September 2007 by PhillipDodson (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Contents

3:30 Action points from last meeting:

  • Alisa: Get plan for blue light on wiki (from 10 Aug). Alisa has done a plan but this is not on Wiki.

3:35 Status Reports: (5 minutes each including any discussion)

  • Pat : Red light receptor progress/design/plan- needs?
    • M30109: Must construct from scratch plan to be produced by Pat.
      • craig seqenced Cph8 from M30109 first part present
      • Cph8 from initial plate not functional
    • This is then drives RBS-ComP-term
      • RBS-ComP -done
    • Also required is ConstitutiveProm-RBS-ComA-term
      • RBS-ComA-term -done


  • Jan & Alisa: Blue light receptor design/plan progress - needs?
    • ComP and SopII conbined at variouse points by using 4 primer stiching:
      • Comp P forward
      • SopII reverse
      • ComP-SoPII overlap sense
      • ComP-SopII overlap antisense
    • Note that there are 7 different stiching pairs that result in combination at different points.-Done
    • The product is then combined with RBS -Done
    • Sequencing being performed Friday
    • Then transcription terminator
    • The constitutive promotor to create protein generator part.
    • Also Required is reporter construct PsfPromoter-RBS-LacZ-term
    • Only three colonies pSFR8 grew in LB
  • Phil: Gas vesicles progress/design/plan - needs?
    • Ligation P48J (SpeI & PstI digested) to PCR(GvpL) underway
    • Ligation P48J (SpeI & PstI digested) to PCR(GvpB to GvpU inclusive)(XbaI and PstI digested) underway
    • Buoyancy experiment needs repeating
    • Other parts required from kit->glycerol stocks: B034 (P1-3O) , B0015 (P1-1I or P3-3O), J61034 (P4-8F or 8H)
    • Pat to provide these.

3.55 New Agenda Items:

  • Sally Grass (chemical and biochemical engineering):
    • interested in signal transduction.
    • moving to lab in bio21.
    • will help promote next years comp
    • Suggested Chris contact Lisa Hayes in chem eng re promotion.
  • Phil: Administrative Timetable: (4 Weeks to go)
  • Chris: Next years Comp Plan/preparations
    • Slide prepared
  • Alisa: To make competent cells to replace Joes
  • Alisa: Tshirt should be simple based on Melb Uni logo, will propose a design
  • Paul: suggested Ian Potter foundation may provide travel funding
  • Next meeting: <b/> 27th September (Thurs) 3.30PM.

5:00 End

Igem Administrative Timetable:

1 October Final team rosters due.
1 October Jamboree attendance fees due $100USD per team member.
26 October Project and wiki & part documentation frozen, DNA received USA.
3-4 November iGEM Competition Jamboree, MIT, USA.


.


  • re prism :Edmund optics:VIS60 Schott veril linear variable interference filter SGD$1600 25mm wide 60mm long linear 400nm-700nm (contact sheet)

N47-279 eqilateral prism 35mm long 35mm face SGD$162


Documentation wiki status:

    • Priority should be on plans and experimental report analysis and conclusions-----Alisa .
    • If only Pat & Alisa doing lab work not much documentation needed.
    • Equipement:
      • MissingLas3000 method (in lab notebook)
      • Missing DNA measurement protocol (eppendorf)
    • Reagents pages incomplete:
      • Some location pictures not finished or uploaded.
      • Some newer reagents not entered.
    • Secondary reagents pages not made:
      • LB, Plates, TAE , NZY+ Broth
    • Protocol part:
      • No connections from Protocols to reagents.
      • Ligation protocol missing
    • Lab notebook:
      • Format uses too many lines to see connections between days.
      • Latter part missing links
      • Can table of contents be restricted to date level?
    • Experimental reports:
      • Lacks discussion/conclusion
      • Ligation experiment missing
      • Lattest few gells not marked up and entered.
    • Project overview link broken
    • Background:
      • GFP missing ,
      • Red photo sensor to GFP test harness missing.
    • Plan: Only Gas vesicles plan entered.


IndividualDesired time committment
Pat About 4h/wk Monday afternoon or Tuesday morning
Alisa About 4h/wk - Thursday afternoon
Jan About 10h/pw - flexible weekday mornings
Phil About 18h/pw - Thursday morning, Friday, Saturday or Sunday,