Melbourne/meeting 27 July 2007

From 2007.igem.org

< Melbourne
Revision as of 02:10, 2 August 2007 by PhillipDodson (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Contents

5:30 Action points from last meeting:

  • Alisa: Wiki "Parts_used status" up to date? -(outstanfding from 19/7/07)
  • Jan: Lecture Timetables spread sheet complete: attached.
  • Phil: Status of #BBa-M30109 & #BBa-V1012 = "will ship this week".
  • Jan: Production of sequence for blue light receptor? " -designed

5:45 Status Reports: (5 minutes each including any discussion)

  • Alisa: Ligation experiments progress.
  • Alisa: Red light receptor progress/design/plan- needs.
    • Plan to be completed to be put on wiki this week
  • Jan: Blue light receptor design/plan - needs.
    • design completed, Plan to be completed and put on wiki this week
  • Phil: Gas vesicles progress/design/plan - needs.
    • Plan up to basic biobrick complete,
    • Primers not requested for Friday delivery so cant proceed this week end.
    • Mutagenesis primers will be redesigned by hand for delivery next Friday.
    • Biobrick prefix/sufix primers to be designed this week.
    • Plan for support parts/test harness required.
  • Kasia: Documentation progress vs last report/ new problems/ needs.-No report

6.15 New Agenda Items:

  • Phil: Individuals desired time commitment?

eg 12hrs per week equiv to an extra subject, or 3 hrs on wed afternoon only...


  • Phil: Administrative Timetable: (12 Weeks to go)

Fab request & project description by Tuesday 31 July. "Produce and characterize buoyant bacteria and light receptor components of coliforming system."

6:30 End

Igem Administrative Timetable:

  • 31 July Must lodge fabrication request to receive quota.
  • 1 August Team project descriptions due.
  • 1 September Final team rosters due.
  • 1 September Jamboree attendance fees due $100USD per team

member.

  • 26 October Project and part documentation due DNA received USA.
  • 26 October BioBrick Part DNA received by the Registry.
  • 3-4 November iGEM Competition Jamboree, MIT, USA.


.

    • Some items require ordering,round bottom falcon tubes, or manufacture NZY broth, blue/white plate.
    • Lac promotor and antibiotic death plasmids required.
    • Primers on critical path -------phil to complete ASAP.
  • Jan Status report on Blue light sensor and light box apperatus, lead time on DNA fabrication?
    • Plan to have biobrick fabricated (up to 3Kb on fast turnarround= 525USD.)
  • Adhesion: to be abbandoned for this year, unless clever idea comes to mind.
  • Documentation wiki status:
    • Priority should be on plans and experimental report analysis and conclusions-----Alisa .
    • If only Pat & Alisa doing lab work not much documentation needed.
    • Equipement:
      • MissingLas3000 method (in lab notebook)
      • Missing DNA measurement protocol (eppendorf)
    • Reagents pages incomplete:
      • Some location pictures not finished or uploaded.
      • Some newer reagents not entered.
    • Secondary reagents pages not made:
      • LB, Plates, TAE , NZY+ Broth
    • Protocol part:
      • No connections from Protocols to reagents.
      • Ligation protocol missing
    • Lab notebook:
      • Format uses too many lines to see connections between days.
      • Latter part missing links
      • Can table of contents be restricted to date level?
    • Experimental reports:
      • Lacks discussion/conclusion
      • Ligation experiment missing
      • Lattest few gells not marked up and entered.
    • Project overview link broken
    • Background:
      • GFP missing ,
      • Red photo sensor to GFP test harness missing.
    • Plan: Only Gas vesicles plan entered.