Melbourne/meeting 20 September 2007
From 2007.igem.org
Contents |
3:30 Action points from last meeting:
- Alisa: Get plan for blue light on wiki (from 10 Aug). Alisa has done a plan but this is not on Wiki.
3:35 Status Reports: (5 minutes each including any discussion)
- Pat : Red light receptor progress/design/plan- needs?
- M30109: Must construct from scratch plan to be produced by Pat.
- craig seqenced Cph8 from M30109 first part present
- Cph8 from initial plate not functional
- This is then drives RBS-ComP-term
- RBS-ComP -done
- Also required is ConstitutiveProm-RBS-ComA-term
- RBS-ComA-term -done
- M30109: Must construct from scratch plan to be produced by Pat.
- Jan & Alisa: Blue light receptor design/plan progress - needs?
- ComP and SopII conbined at variouse points by using 4 primer stiching:
- Comp P forward
- SopII reverse
- ComP-SoPII overlap sense
- ComP-SopII overlap antisense
- Note that there are 7 different stiching pairs that result in combination at different points.-Done
- The product is then combined with RBS -Done
- Sequencing being performed Friday
- Then transcription terminator
- The constitutive promotor to create protein generator part.
- Also Required is reporter construct PsfPromoter-RBS-LacZ-term
- Only three colonies pSFR8 grew in LB
- ComP and SopII conbined at variouse points by using 4 primer stiching:
- Phil: Gas vesicles progress/design/plan - needs?
- Ligation P48J (SpeI & PstI digested) to PCR(GvpL) underway
- Ligation P48J (SpeI & PstI digested) to PCR(GvpB to GvpU inclusive)(XbaI and PstI digested) underway
- Buoyancy experiment needs repeating
- Other parts required from kit->glycerol stocks: B034 (P1-3O) , B0015 (P1-1I or P3-3O), J61034 (P4-8F or 8H)
- Pat to provide these.
3.55 New Agenda Items:
- Sally Grass (chemical and biochemical engineering):
- interested in signal transduction.
- moving to lab in bio21.
- will help promote next years comp
- Suggested Chris contact Lisa Hayes in chem eng re promotion.
- Phil: Administrative Timetable: (4 Weeks to go)
- Chris: Next years Comp Plan/preparations
- Slide prepared
- Alisa: To make competent cells to replace Joes
- Alisa: Tshirt should be simple based on Melb Uni logo, will propose a design
- Paul: suggested Ian Potter foundation may provide travel funding
- Next meeting: <b/> 27th September (Thurs) 3.30PM.
5:00 End
Igem Administrative Timetable:
1 October | Final team rosters due. |
1 October | Jamboree attendance fees due $100USD per team member. |
26 October | Project and wiki & part documentation frozen, DNA received USA. |
3-4 November | iGEM Competition Jamboree, MIT, USA. |
.
- re prism :Edmund optics:VIS60 Schott veril linear variable interference filter SGD$1600 25mm wide 60mm long linear 400nm-700nm (contact sheet)
N47-279 eqilateral prism 35mm long 35mm face SGD$162
Documentation wiki status:
- Priority should be on plans and experimental report analysis and conclusions-----Alisa .
- If only Pat & Alisa doing lab work not much documentation needed.
- Equipement:
- MissingLas3000 method (in lab notebook)
- Missing DNA measurement protocol (eppendorf)
- Reagents pages incomplete:
- Some location pictures not finished or uploaded.
- Some newer reagents not entered.
- Secondary reagents pages not made:
- LB, Plates, TAE , NZY+ Broth
- Protocol part:
- No connections from Protocols to reagents.
- Ligation protocol missing
- Lab notebook:
- Format uses too many lines to see connections between days.
- Latter part missing links
- Can table of contents be restricted to date level?
- Experimental reports:
- Lacks discussion/conclusion
- Ligation experiment missing
- Lattest few gells not marked up and entered.
- Project overview link broken
- Background:
- GFP missing ,
- Red photo sensor to GFP test harness missing.
- Plan: Only Gas vesicles plan entered.
Individual | Desired time committment |
---|---|
Pat | About 4h/wk Monday afternoon or Tuesday morning |
Alisa | About 4h/wk - Thursday afternoon |
Jan | About 10h/pw - flexible weekday mornings |
Phil | About 18h/pw - Thursday morning, Friday, Saturday or Sunday, |