- | = 5:30 Action points from last meeting:= | + | == 5:30 Action points from last meeting:== |
- | * Alisa: Wiki "Parts_used status" up to date? -(outstanfding from 19/7/07) | + | * <b>Alisa: </b>Wiki "Parts_used status" up to date? -(outstanfding from 19/7/07) |
- | * Jan: Lecture Timetables spread sheet complete: attached. | + | * <b>Jan:</b> Lecture Timetables spread sheet complete: attached. |
- | * Phil: Status of #BBa-M30109 & #BBa-V1012 = "will ship this week". | + | * <b>Phil:</b> Status of #BBa-M30109 & #BBa-V1012 = "will ship this week". |
- | * Jan: Production of sequence for blue light receptor? " -designed | + | * <b>Jan:</b> Production of sequence for blue light receptor? " -designed |
- | = 5:45 Status Reports: (5 minutes each including any discussion)= | + | == 5:45 Status Reports: (5 minutes each including any discussion)== |
- | * Alisa: Ligation experiments progress. | + | * <b>Alisa: </b> Ligation experiments progress. |
- | ** | + | ** Problem: 1.2KB genes between biobrick forward & reverse primers not being visualised in colony PCR with 1.5min extn time. (300bp fragments do amplify) |
- | * Alisa: Red light receptor progress/design/plan- needs. | + | *** - <b>craig</b> to try and repeat. |
- | ** Plan to be completed to be put on wiki this week | + | *** - <b>Alisa: </b> has digestion in progress as alternative diagnostic to prove if problem is ligation or PCR. |
- | * Jan: Blue light receptor design/plan - needs. | + | *** - <b>Alisa: </b>believes alkaline phosphatase damage is cause of problem. |
- | ** design completed, Plan to be completed and put on wiki this week | + | * <b>Alisa: </b> Red light receptor progress/design/plan- needs. |
- | * Phil: Gas vesicles progress/design/plan - needs. | + | ** Plan to be completed to be put on wiki this week, estimated at six weeks duration. |
+ | * <b>Jan:</b> Blue light receptor design/plan - needs. | ||
+ | ** design completed, Plan to be completed and put on wiki this week -<b>Jan</b> | ||
+ | ** Theory to be put on the wiki this week -<b> Jan</b>,-<b>Alisa </b> to review | ||
+ | ** ComA to be ordered by tuesday under discount plan | ||
+ | ** ComP fusion to be ordered ASAP. | ||
+ | |||
+ | * <b>Phil:</b> Gas vesicles progress/design/plan - needs. | ||
** Plan up to basic biobrick complete, | ** Plan up to basic biobrick complete, | ||
** Primers not requested for Friday delivery so cant proceed this week end. | ** Primers not requested for Friday delivery so cant proceed this week end. | ||
Line 17: | Line 24: | ||
** Biobrick prefix/sufix primers to be designed this week. | ** Biobrick prefix/sufix primers to be designed this week. | ||
** Plan for support parts/test harness required. | ** Plan for support parts/test harness required. | ||
- | * Kasia: Documentation progress vs last report/ new problems/ needs.-No report | + | ** Some items require ordering,round bottom falcon tubes, or manufacture NZY broth, blue/white plate. |
- | =6.15 New Agenda Items:= | + | ** Lac promotor and antibiotic death plasmids required. |
- | * Phil: Individuals desired time commitment | + | * <b>Pat:</b> |
- | + | ** Will transform, growup and prepare glycerol stocks of death plasmid in DB3.1 this week. | |
- | + | * <b>Kasia:</b> Documentation progress vs last report/ new problems/ needs.-No report | |
- | + | ==6.15 New Agenda Items:== | |
+ | * <b>Phil:</b> Individuals desired time commitment: | ||
+ | {|border="1" | ||
+ | !Individual!!Desired time committment | ||
+ | |- | ||
+ | |Pat|| About 4h/wk Monday afternoon or Tuesday morning | ||
+ | |- | ||
+ | |Alisa|| About 4h/wk - Thursday afternoon | ||
+ | |- | ||
+ | |Jan || About 10h/pw - flexible weekday mornings | ||
+ | |- | ||
+ | |Phil || About 18h/pw - Thursday morning, Friday, Saturday or Sunday, | ||
+ | |} | ||
- | * Phil: Administrative Timetable: (12 Weeks to go) | + | * <b>Phil:</b> Administrative Timetable: (12 Weeks to go) |
- | + | ** Fab request & project description by Tuesday 31 July. | |
- | + | ** "Produce and characterize buoyant bacteria and light receptor components of coliforming system." | |
- | + | * <b>Next meeting: <b/> 6th August (Monday) 1.15PM agreed but latter changed to 3rd Aug (Friday) 5:30PM. | |
- | =6:30 End = | + | ==6:30 End == |
- | =Igem Administrative Timetable:= | + | ==Igem Administrative Timetable:== |
- | + | {|border="1" | |
- | + | |- | |
- | + | |1 August || Team project descriptions due. | |
- | + | |- | |
+ | |1 September || Final team rosters due. | ||
+ | |- | ||
+ | |1 September|| Jamboree attendance fees due $100USD per team | ||
member. | member. | ||
- | + | |- | |
- | + | |26 October|| Project and part documentation due DNA received USA. | |
- | + | |- | |
- | + | |26 October || BioBrick Part DNA received by the Registry. | |
- | + | |- | |
+ | |3-4 November || iGEM Competition Jamboree, MIT, USA. | ||
+ | |} | ||
. | . | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | + | == Documentation wiki status:== | |
**Priority should be on plans and experimental report analysis and conclusions-----Alisa . | **Priority should be on plans and experimental report analysis and conclusions-----Alisa . | ||
**If only Pat & Alisa doing lab work not much documentation needed. | **If only Pat & Alisa doing lab work not much documentation needed. |
Revision as of 03:11, 2 August 2007
Contents |
5:30 Action points from last meeting:
- Alisa: Wiki "Parts_used status" up to date? -(outstanfding from 19/7/07)
- Jan: Lecture Timetables spread sheet complete: attached.
- Phil: Status of #BBa-M30109 & #BBa-V1012 = "will ship this week".
- Jan: Production of sequence for blue light receptor? " -designed
5:45 Status Reports: (5 minutes each including any discussion)
- Alisa: Ligation experiments progress.
- Problem: 1.2KB genes between biobrick forward & reverse primers not being visualised in colony PCR with 1.5min extn time. (300bp fragments do amplify)
- - craig to try and repeat.
- - Alisa: has digestion in progress as alternative diagnostic to prove if problem is ligation or PCR.
- - Alisa: believes alkaline phosphatase damage is cause of problem.
- Problem: 1.2KB genes between biobrick forward & reverse primers not being visualised in colony PCR with 1.5min extn time. (300bp fragments do amplify)
- Alisa: Red light receptor progress/design/plan- needs.
- Plan to be completed to be put on wiki this week, estimated at six weeks duration.
- Jan: Blue light receptor design/plan - needs.
- design completed, Plan to be completed and put on wiki this week -Jan
- Theory to be put on the wiki this week - Jan,-Alisa to review
- ComA to be ordered by tuesday under discount plan
- ComP fusion to be ordered ASAP.
- Phil: Gas vesicles progress/design/plan - needs.
- Plan up to basic biobrick complete,
- Primers not requested for Friday delivery so cant proceed this week end.
- Mutagenesis primers will be redesigned by hand for delivery next Friday.
- Biobrick prefix/sufix primers to be designed this week.
- Plan for support parts/test harness required.
- Some items require ordering,round bottom falcon tubes, or manufacture NZY broth, blue/white plate.
- Lac promotor and antibiotic death plasmids required.
- Pat:
- Will transform, growup and prepare glycerol stocks of death plasmid in DB3.1 this week.
- Kasia: Documentation progress vs last report/ new problems/ needs.-No report
6.15 New Agenda Items:
- Phil: Individuals desired time commitment:
Individual | Desired time committment |
---|---|
Pat | About 4h/wk Monday afternoon or Tuesday morning |
Alisa | About 4h/wk - Thursday afternoon |
Jan | About 10h/pw - flexible weekday mornings |
Phil | About 18h/pw - Thursday morning, Friday, Saturday or Sunday, |
- Phil: Administrative Timetable: (12 Weeks to go)
- Fab request & project description by Tuesday 31 July.
- "Produce and characterize buoyant bacteria and light receptor components of coliforming system."
- Next meeting: <b/> 6th August (Monday) 1.15PM agreed but latter changed to 3rd Aug (Friday) 5:30PM.
6:30 End
Igem Administrative Timetable:
1 August | Team project descriptions due. |
1 September | Final team rosters due. |
1 September | Jamboree attendance fees due $100USD per team
member. |
26 October | Project and part documentation due DNA received USA. |
26 October | BioBrick Part DNA received by the Registry. |
3-4 November | iGEM Competition Jamboree, MIT, USA. |
.
Documentation wiki status:
- Priority should be on plans and experimental report analysis and conclusions-----Alisa .
- If only Pat & Alisa doing lab work not much documentation needed.
- Equipement:
- MissingLas3000 method (in lab notebook)
- Missing DNA measurement protocol (eppendorf)
- Reagents pages incomplete:
- Some location pictures not finished or uploaded.
- Some newer reagents not entered.
- Secondary reagents pages not made:
- LB, Plates, TAE , NZY+ Broth
- Protocol part:
- No connections from Protocols to reagents.
- Ligation protocol missing
- Lab notebook:
- Format uses too many lines to see connections between days.
- Latter part missing links
- Can table of contents be restricted to date level?
- Experimental reports:
- Lacks discussion/conclusion
- Ligation experiment missing
- Lattest few gells not marked up and entered.
- Project overview link broken
- Background:
- GFP missing ,
- Red photo sensor to GFP test harness missing.
- Plan: Only Gas vesicles plan entered.