Melbourne/meeting 14 September 2007
From 2007.igem.org
(Difference between revisions)
Line 2: | Line 2: | ||
*Jan: Plan for blue light on wiki by 17th August- Done but needs more work: couldn’t get anyone else to implement it based on this! | *Jan: Plan for blue light on wiki by 17th August- Done but needs more work: couldn’t get anyone else to implement it based on this! | ||
- | |||
== 5:35 Status Reports: (5 minutes each including any discussion)== | == 5:35 Status Reports: (5 minutes each including any discussion)== | ||
- | *Pat | + | *Pat : Red light receptor progress/design/plan- needs? |
- | **M30109 | + | **M30109: Must construct from scratch plan to be produced by Pat. |
- | + | ||
- | *Jan: Blue light receptor design/plan progress - needs? | + | *Jan & Alisa: Blue light receptor design/plan progress - needs? |
**Primers ComA and Com P all in | **Primers ComA and Com P all in | ||
+ | **Rapid Ligase 5min purchased | ||
+ | **ComP and SopII to be conbined at variouse points by using 4 primer stiching: | ||
+ | ***Comp P forward | ||
+ | ***SopII reverse | ||
+ | ***ComP-SoPII overlap sense | ||
+ | ***ComP-SopII overlap antisense | ||
+ | **Note that there are 7 different stiching pairs that result in combination at different points. | ||
+ | **The product is then combined with RBS and terminator | ||
*Phil: Gas vesicles progress/design/plan - needs? | *Phil: Gas vesicles progress/design/plan - needs? |
Revision as of 01:55, 20 September 2007
Contents |
5:30 Action points from last meeting:
- Jan: Plan for blue light on wiki by 17th August- Done but needs more work: couldn’t get anyone else to implement it based on this!
5:35 Status Reports: (5 minutes each including any discussion)
- Pat : Red light receptor progress/design/plan- needs?
- M30109: Must construct from scratch plan to be produced by Pat.
- Jan & Alisa: Blue light receptor design/plan progress - needs?
- Primers ComA and Com P all in
- Rapid Ligase 5min purchased
- ComP and SopII to be conbined at variouse points by using 4 primer stiching:
- Comp P forward
- SopII reverse
- ComP-SoPII overlap sense
- ComP-SopII overlap antisense
- Note that there are 7 different stiching pairs that result in combination at different points.
- The product is then combined with RBS and terminator
- Phil: Gas vesicles progress/design/plan - needs?
- Primers for part creation in
- No Progress , round 4 of mutagenesis plated awaits culture and diggest(4 plates).
- Buoyancy experiment needs repeating
- Other parts required from kit->glycerol stocks: B034 (P1-3O) , B0015 (P1-1I or P3-3O), J61034 (P4-8F or 8H)
5.55 New Agenda Items:
- Phil: Administrative Timetable: (5 Weeks to go)
- Chris: Next years Comp Plan/preparations - no progress
- Next meeting: <b/> 21th September (Friday) 5.30PM.
6:15 End
Igem Administrative Timetable:
1 September | Final team rosters due. |
1 September | Jamboree attendance fees due $100USD per team member. |
26 October | Project and part documentation due DNA received USA. |
26 October | BioBrick Part DNA received by the Registry. |
3-4 November | iGEM Competition Jamboree, MIT, USA. |
.
- re prism :Edmund optics:VIS60 Schott veril linear variable interference filter SGD$1600 25mm wide 60mm long linear 400nm-700nm (contact sheet)
N47-279 eqilateral prism 35mm long 35mm face SGD$162
Documentation wiki status:
- Priority should be on plans and experimental report analysis and conclusions-----Alisa .
- If only Pat & Alisa doing lab work not much documentation needed.
- Equipement:
- MissingLas3000 method (in lab notebook)
- Missing DNA measurement protocol (eppendorf)
- Reagents pages incomplete:
- Some location pictures not finished or uploaded.
- Some newer reagents not entered.
- Secondary reagents pages not made:
- LB, Plates, TAE , NZY+ Broth
- Protocol part:
- No connections from Protocols to reagents.
- Ligation protocol missing
- Lab notebook:
- Format uses too many lines to see connections between days.
- Latter part missing links
- Can table of contents be restricted to date level?
- Experimental reports:
- Lacks discussion/conclusion
- Ligation experiment missing
- Lattest few gells not marked up and entered.
- Project overview link broken
- Background:
- GFP missing ,
- Red photo sensor to GFP test harness missing.
- Plan: Only Gas vesicles plan entered.
Individual | Desired time committment |
---|---|
Pat | About 4h/wk Monday afternoon or Tuesday morning |
Alisa | About 4h/wk - Thursday afternoon |
Jan | About 10h/pw - flexible weekday mornings |
Phil | About 18h/pw - Thursday morning, Friday, Saturday or Sunday, |