- Alisa: Status report on experimental work:
- Igem parts:availability of glycerol stocks , plasmid DNA etc of parts.
- Essentially: ( https://2007.igem.org/Melbourne/Parts_used )
- Results of ligation experiments.
- Needs/missing: ENZ-, ...
- Igem parts:availability of glycerol stocks , plasmid DNA etc of parts.
- Phil Status report on gas vesicles and gas vesicle plans:
- currently have cells growing on plates - no checks done yet.
- Plan up to Biobricks of basic parts outlined at 9 weeks including US shippment.(we have 13 max).
- Details complete up to end of mutation for pNL29 but not pNL26 using primers designed by stratagene program. Urgent for .
- Some items require ordering,round bottom falcon tubes, or manufacture NZY broth, blue/white plate.
- Lac promotor and antibiotic death plasmids required.
- Primers on critical path -------phil to complete ASAP.
- Jan Status report on Blue light sensor and light box apperatus, lead time on DNA fabrication?
- Plan to have biobrick fabricated (up to 3Kb on fast turnarround= 525USD.)
- Adhesion: to be abbandoned for this year, unless clever idea comes to mind.
- Phil:Status report documentation wiki:
- synopsis: A lot to be done, -------Kasia to help.
- Priority should be on plans and experimental report analysis and conclusions-----Alisa .
- If only Pat & Alisa doing lab work not much documentation needed.
- Equipement:
- MissingLas3000 method (in lab notebook)
- Missing DNA measurement protocol (eppendorf)
- Reagents pages incomplete:
- Some location pictures not finished or uploaded.
- Some newer reagents not entered.
- Secondary reagents pages not made:
- LB, Plates, TAE , NZY+ Broth
- Protocol part:
- No connections from Protocols to reagents.
- Ligation protocol missing
- Lab notebook:
- Format uses too many lines to see connections between days.
- Latter part missing links
- Can table of contents be restricted to date level?
- Experimental reports:
- Lacks discussion/conclusion
- Ligation experiment missing
- Lattest few gells not marked up and entered.
- Project overview link broken
- Background:
- GFP missing ,
- Red photo sensor to GFP test harness missing.
- Plan: Only Gas vesicles plan entered.
- Phil: Admin timetable: 13wks to go.
- 1 August Team project descriptions due (Late summer teams)
- 1 September Final team rosters due
- 1 September Jamboree attendance fees due $100USD per member + 225USD for others.
- 26 October Project and part documentation due DNA recieved USA
- 26 October BioBrick Part DNA received by the Registry
- 3-4 November iGEM Competition Jamboree, MIT, USA
- ALL:Individuals desired time committment? (outstanding)
(eg 12hrs per week equiv to an extra subject, 3 hrs on wed afternoon only)
- Desire to travel/ present at MIT in November?
- Timetabling. Jan to complete.
- Discussion:
- What can we reasonably expect to achieve? Not adhesion. Reframe as two year project- parts this year.
- Jan keen to go to MIT to present, no one else particularly due to exam timetable.
- Synthesis details:
- 30Kb per month 100kb total all teams divided equally 57 teams until 31 July(2Kbp max).
- USD 25c per bp. 75c beyond that .
- maximum construct length 1kbp sub cloned into geneart standard vector.
- lead time 12 days plus shipping say 3weeks total.
- standard 8day fast track plus shipping 2 weeks 100bp USD435 , 3000bp USD 525.