Imperial/Cell by Date/Implementation

From 2007.igem.org

< Imperial
Revision as of 02:35, 27 October 2007 by Maira (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)




Cell by Date: Implementation

DNA Construct Implementation
Construct Design Concept 1
IC07 design CBDcon1.png
Concept 2
IC07 design CBDcon2.png
Stage 1: Availability

Icegems-Devcycle-downarrow.png
Found as [http://partsregistry.org/Part:BBa_I13522 BBa_I13522] in Registry Found as [http://partsregistry.org/Part:BBa_E7104 BBa_E7104] in Registry.
Stage 2: Cloning / Amplification

Icegems-Devcycle-downarrow.png
BBa_I13522 - Lane R2 (937bp + 2079bp vector)
BBa_E7104 - Lane 11 (Missing 826bp)
Stage 3: Ligation

Icegems-Devcycle-downarrow.png
Not Required Since [http://partsregistry.org/Part:BBa_E7104 BBa_E7104] was not functional, we made our own promoter and and ligated it to [http://partsregistry.org/Part:BBa_I13504 BBa_I13504]


Imperial CBD Design CBD4.png + Imperial CBD Design CBD3.png = Imperial CBD Design CBD2.2.png
Stage 4: Purification of Activator Proteins

Icegems-Devcycle-downarrow.png
Not Required Not Required
Stage 5: Quality Control

Icegems-Devcycle-downarrow.png
IC2007 Experiments Phase1 Protocol1-1.jpg

  • Testing in vivo: Passed (Protocols and Results)
  • Sequencing of Construct: Completed
IC 2007 PT7-invitro.png

  • Testing in vitro: Passed (Protocols and Results)
  • Sequencing of Construct: Completed
Stage 6: Final Implementation Status Ready for Testing Ready for Testing



Chassis Construct Implementation
Chassis Design IC07 CFS components.png
Stage 1: Availability

Icegems-Devcycle-downarrow.png
Possibility of making Homemade S30 Cell Extract. Commercially available S30 Cell Extract purchasable from [http://www.promega.com/search/Default.aspx?query=s30+extract Promega].
Stage 2: Preparation

Icegems-Devcycle-downarrow.png
Preparation: Done (Protocol) Preparation: Done (Protocol)
Stage 3: Quality Control

Icegems-Devcycle-downarrow.png
Stage 4: Final Implementation Status Aborted.
Expression capacity of chassis was low.
Ready for Testing



<< Modelling | Implementation | Testing/Validation >>