Imperial/Infector Detector/Implementation

From 2007.igem.org

(Difference between revisions)
(Infector Detector: Implementation)
Line 27: Line 27:
|- align="center"
|- align="center"
|wifth="20%" style="background-color:#ddeeff"| '''Construct Design'''
|wifth="20%" style="background-color:#ddeeff"| '''Construct Design'''
-
|width="40%"| [[Image:Imperial ID Design ID1.png]]
+
|width="40%" align="left" | '''Concept 1''' <br />[[Image:Imperial ID Design ID1.png|center]]
-
|width="40%"| [[Image:Imperial_ID_Design_ID2.png]]
+
|width="40%" align="left" | '''Concept 2''' <br />[[Image:Imperial_ID_Design_ID2.png|center]]
|- align="center"
|- align="center"
|width="20%" style="background-color:#ddeeff"| '''Stage 1: Availability'''
|width="20%" style="background-color:#ddeeff"| '''Stage 1: Availability'''

Revision as of 14:12, 24 October 2007



Infector Detector: Implementation

DNA Construct Implementation
Construct Design Concept 1
Imperial ID Design ID1.png
Concept 2
Imperial ID Design ID2.png
Stage 1: Availability Found as BBa_T9002 in Registry. Found as BBa_J37032 in Registry.
Stage 2: Cloning / Amplification
BBa_T9002 - Lane 18 (1945bp)
BBa_J37032 - Lane R25 (938bp + 2079bp vector)
Stage 3: Ligation Not Required Not Required
Stage 4: Purification of Activator Proteins Not Required LuxR protein (Protocol and Results)
Stage 5: Quality Control
  • Testing in vivo: Done (Protocol and Results)
  • Sequencing of Construct: Pending
  • Testing in vitro: Done (Protocol and Results)
  • Sequencing of Construct: Pending
Stage 6: Final Implementation Status Ready for Testing Aborted.
LuxR protein not functional.



Chassis Construct Implementation
Chassis Design IC07 CFS components.png
Stage 1: Availability Possibility of making Homemade S30 Cell Extract. Commercially available S30 Cell Extract purchasable from Promega.
Stage 2: Preparation Preparation: Done (Protocol) Preparation: Done (Protocol)
Stage 3: Quality Control
  • Testing in vitro: Done (Protocol and Results)
Stage 6: Final Implementation Status Aborted.
Expression capacity of chassis was low.
Ready for Testing



<< Modelling | Implementation | Testing/Validation >>