Imperial/Wet Lab/Lab Notebook/2007-10-04

From 2007.igem.org

< Imperial | Wet Lab | Lab Notebook
Revision as of 20:52, 26 October 2007 by Maira (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

4 October 2007

Calibration and degradation for GFP mut3b

  • Aim: The aim of this test was to get a calibration and degrdation curve for GFP mut3b
  • The protocols used can be found here: Calibration Protocol and Degradation Protocols
  • We got a calibration curve from the experiments, which can be seen here Results
  • The degradation curve can be seen here Results. The results showed that the half life of GFPmut3b is about 1980 minutes, or approximately 33 hours.